Build Over Agreement Checker
A build over agreement may be required when proposed work is over or close to a public sewer or lateral drain. This checker helps you identify the questions to ask the relevant sewerage company before work starts.
Check your proposed building work
This checker highlights questions for the relevant water or sewerage company. Only that company can confirm whether an agreement is required or the design is acceptable.
Guidance checked 2 October 2026. Confirm the current requirements with the relevant regulator or sewerage company before acting.
What a build over agreement is
A build over agreement is an agreement with the relevant sewerage company for qualifying work over or close to a public sewer or lateral drain. The purpose is to protect the sewer and preserve appropriate access for maintenance and repair.
The requirements depend on the sewerage company, the pipe and the proposed work. A build over agreement is separate from planning permission and building control approval, so approval under one process should not be assumed to satisfy another.
We can help with the drainage survey work that often supports an application, including pre construction and post construction CCTV surveys of the affected pipe.

The 3 m rule and Approved Document H4
In England, Approved Document H covers drainage and waste disposal, including provisions relevant to buildings near drains and sewers. Separately, sewerage companies publish their own build over policies. A distance of 3 m from a public sewer is commonly used by companies when deciding whether an application is required, but the exact test and measurement must be checked with the company responsible for the sewer.
If the proposed work is close to a public sewer, the sewerage company may require information about the foundations, the position and condition of the pipe, access for future maintenance or an alternative design such as diversion. Requirements depend on the particular sewer and proposal.
Approved Document H cited here applies in England. Requirements elsewhere in the UK should be checked against the rules and sewerage arrangements applying in that nation.
Why the October 2011 transfer matters
On 1 October 2011, most existing private sewers and lateral drains within the transfer arrangements in England and Wales became the responsibility of sewerage companies. A drain serving one property within that property’s boundary generally remained private, so the status of an individual pipe should be checked rather than assumed from its age alone.
That change matters for build over agreements. A pipe that was private before 2011 may now be the responsibility of a sewerage company. Older work may therefore have been carried out under different ownership or consent arrangements. For work proposed now, check the pipe’s current status and the sewerage company’s current requirements.
Scotland and Northern Ireland have different arrangements for sewer ownership and adoption, so the 2011 transfer does not apply in the same way.
When a build over agreement is likely to be needed
An application may be needed when an extension or other building work is proposed over or close to a public sewer or lateral drain. Sewerage companies set their own criteria, including restrictions based on the type of development, pipe size, position and access requirements.
Typical triggers include:
- An extension or conservatory over or close to a public sewer or lateral drain.
- Development where a recorded public sewer crosses or approaches the proposed footprint.
- A garage or other structure proposed close to a public sewer.
- Work that could affect access to or protection of a public sewer.
Not every project near a sewer needs an agreement, and some forms of development may require a different process such as sewer diversion. The relevant sewerage company’s current requirements are the definitive reference for the site.

What water companies typically ask for
Application types and technical requirements vary between sewerage companies. Depending on the proposal, the company may ask for drawings, foundation details, sewer records, CCTV survey information or other site-specific evidence. Some application types include or require pre-construction and post-construction CCTV surveys.
Pipe diameter, depth, location and ownership can affect whether building over a sewer is permitted. A sewerage company may require protective measures, changes to the proposed foundations or diversion of the pipe. Its published requirements determine which proposals can be considered.
Using the checker
The checker asks questions about the proposed work and the drain or sewer near it. It provides guidance on points to check with the relevant sewerage company. It does not classify the pipe, confirm that an agreement is required or give permission to build.
The checker result can be printed or saved as a PDF using your browser’s print function. It is an initial indication only and does not establish whether the sewerage company will approve the proposed work.
We can help with build over CCTV surveys before and after construction, and with drain mapping where the position of the sewer needs to be confirmed.
Surveys that support an application
A pre construction CCTV survey records the condition of the sewer before work starts. It shows visible internal surfaces, including joints, cracks and existing defects. It cannot see through deposits or detect every defect, and the report contents depend on the agreed specification.
A sewerage company may also require a post-construction survey so the condition can be compared with the earlier record. Any action required where a defect is identified is for the sewerage company and the parties involved to determine.
Where the sewer cannot be accessed from existing manholes, a dye test can help confirm connections. For a broader picture of the drainage, a drainage survey may be more suitable.
Costs and timescales
Water companies set their own application fees, and these vary. Some charge a fixed fee, others charge based on the size and complexity of the sewer. A survey, drawings and any foundation design are separate costs.
Application times vary between sewerage companies and depend on the proposal. Cases involving sewer diversions, structural concerns or additional investigations may take longer than straightforward applications. Published processing times are not guarantees of approval.
Prices require a real quote. The drivers include the length of sewer to be surveyed, the number of manholes, access arrangements and whether a post construction survey is also needed.
What to do if you are unsure
Sewer records may show a public sewer close to a proposed building, but its recorded position may differ from its actual location. CCTV combined with sonde tracing can help establish the line of a suitable accessible pipe. Further investigation may be needed to establish depth or confirm the position where tracing is inconclusive.
Then contact the sewerage company responsible for the sewer. Ask whether an agreement is needed, what information they require, and whether they need a survey before or after the work. Keep the response with your project records.
If work has already been completed without an agreement, contact the sewerage company responsible for the sewer and explain what has been built. Retrospective applications are possible in some circumstances, but the evidence and any remedial action required depend on the company and the site.
Free online tool
Build Over Agreement Checker
Building over or near public drains and sewers
Common questions
Frequently asked questions
What happens if I built without a build over agreement?
Contact the sewerage company responsible for the sewer and explain what has been built. Retrospective applications are possible in some circumstances, but the information, surveys and any remedial work required depend on the company and the site.
Can I sell a house with no build over agreement?
A buyer's solicitor may raise questions where building work appears to affect a public sewer and no agreement is available. The appropriate response depends on the sewer status, when the work was carried out and the relevant sewerage company's requirements. Your conveyancer can advise what evidence is needed for the transaction.
Do pre 2011 extensions need a build over agreement?
Many private sewers and lateral drains in England and Wales transferred to sewerage companies on 1 October 2011. A pipe may therefore have become public after building work was completed. Whether an agreement was required at the time depends on the pipe's status and the rules then applying. Historic drainage records and the sewerage company's records may help establish the position.
How much does a build over agreement cost?
Water companies set their own application fees, and these vary by company and by the size of the sewer. A survey, drawings and any foundation design are separate. Prices require a real quote, and the drivers include the length of sewer surveyed, access and whether a post construction survey is needed.
Request a quote