Build Over Agreement Checker

A build over agreement may be required when proposed work is over or close to a public sewer or lateral drain. This checker helps you identify the questions to ask the relevant sewerage company before work starts.

Check your proposed building work

This checker highlights questions for the relevant water or sewerage company. Only that company can confirm whether an agreement is required or the design is acceptable.

Guidance checked 2 October 2026. Confirm the current requirements with the relevant regulator or sewerage company before acting.

What a build over agreement is

A build over agreement is an agreement with the relevant sewerage company for qualifying work over or close to a public sewer or lateral drain. The purpose is to protect the sewer and preserve appropriate access for maintenance and repair.

The requirements depend on the sewerage company, the pipe and the proposed work. A build over agreement is separate from planning permission and building control approval, so approval under one process should not be assumed to satisfy another.

We can help with the drainage survey work that often supports an application, including pre construction and post construction CCTV surveys of the affected pipe.

Surveyors discussing site plans outdoors.

The 3 m rule and Approved Document H4

In England, Approved Document H covers drainage and waste disposal, including provisions relevant to buildings near drains and sewers. Separately, sewerage companies publish their own build over policies. A distance of 3 m from a public sewer is commonly used by companies when deciding whether an application is required, but the exact test and measurement must be checked with the company responsible for the sewer.

If the proposed work is close to a public sewer, the sewerage company may require information about the foundations, the position and condition of the pipe, access for future maintenance or an alternative design such as diversion. Requirements depend on the particular sewer and proposal.

Approved Document H cited here applies in England. Requirements elsewhere in the UK should be checked against the rules and sewerage arrangements applying in that nation.

Why the October 2011 transfer matters

On 1 October 2011, most existing private sewers and lateral drains within the transfer arrangements in England and Wales became the responsibility of sewerage companies. A drain serving one property within that property’s boundary generally remained private, so the status of an individual pipe should be checked rather than assumed from its age alone.

That change matters for build over agreements. A pipe that was private before 2011 may now be the responsibility of a sewerage company. Older work may therefore have been carried out under different ownership or consent arrangements. For work proposed now, check the pipe’s current status and the sewerage company’s current requirements.

Scotland and Northern Ireland have different arrangements for sewer ownership and adoption, so the 2011 transfer does not apply in the same way.

When a build over agreement is likely to be needed

An application may be needed when an extension or other building work is proposed over or close to a public sewer or lateral drain. Sewerage companies set their own criteria, including restrictions based on the type of development, pipe size, position and access requirements.

Typical triggers include:

  • An extension or conservatory over or close to a public sewer or lateral drain.
  • Development where a recorded public sewer crosses or approaches the proposed footprint.
  • A garage or other structure proposed close to a public sewer.
  • Work that could affect access to or protection of a public sewer.

Not every project near a sewer needs an agreement, and some forms of development may require a different route such as sewer diversion. The relevant sewerage company’s current requirements provide the definitive starting point for the site.

Worker measuring a drainage pipe inside an excavated trench.

What water companies typically ask for

Application routes and technical requirements vary between sewerage companies. Depending on the proposal, the company may ask for drawings, foundation details, sewer records, CCTV survey information or other site-specific evidence. Some application routes include or require pre-construction and post-construction CCTV surveys.

Pipe size, sewer type, depth, location and the nature of the development can affect whether a standard build over route is available. Some proposals may require a sewer diversion or further technical assessment instead. Check the current published requirements of the sewerage company responsible for the site before commissioning supporting work.

Using the checker

The checker asks questions about the proposed work and the drain or sewer near it. It provides guidance on points to check with the relevant sewerage company. It does not classify the pipe, confirm that an agreement is required or give permission to build.

You can print the result or save it as a PDF from your browser. If you want a survey to support an application, the result can pre fill an enquiry.

We can help with build over CCTV surveys before and after construction, and with drain mapping where the position of the sewer needs to be confirmed.

Surveys that support an application

A pre construction CCTV survey records the condition of the sewer before work starts. It shows visible internal surfaces, including joints, cracks and existing defects. It cannot see through deposits or detect every defect, and the report contents depend on the agreed specification.

A sewerage company may also require a post-construction survey so the condition can be compared with the earlier record. Any action required where a defect is identified is for the sewerage company and the parties involved to determine.

Where the sewer cannot be accessed from existing manholes, a dye test can help confirm connections. For a broader picture of the drainage, a drainage survey may be more suitable.

Costs and timescales

Water companies set their own application fees, and these vary. Some charge a fixed fee, others charge based on the size and complexity of the sewer. A survey, drawings and any foundation design are separate costs.

Timescales depend on the sewerage company, the application route, the information supplied and whether further investigation or design work is required. Check the company’s current published timescales when planning the work.

Prices require a real quote. The drivers include the length of sewer to be surveyed, the number of manholes, access arrangements and whether a post construction survey is also needed.

What to do if you are unsure

Start by finding out whether a public sewer is near the proposed work. Sewer records show the recorded position, but they may not establish the exact line on site. CCTV, sonde tracing or other site investigation can help establish the pipe’s route and depth where this is needed.

Then contact the sewerage company responsible for the sewer. Ask whether an agreement is needed, what information they require, and whether they need a survey before or after the work. Keep the response with your project records.

If work has already been completed without an agreement, contact the sewerage company responsible for the sewer and explain what has been built. Retrospective application routes exist in some circumstances, but the evidence and any remedial action required depend on the company and the site.

Free online tool

Build Over Agreement Checker

Check what to ask your sewerage company before building near a drain or sewer.

Use the checker

Common questions

Frequently asked questions

What happens if I built without a build over agreement?

Contact the sewerage company responsible for the sewer and explain what has been built. Retrospective application routes exist in some circumstances, but the information, surveys and any remedial work required depend on the company and the site.

Can I sell a house with no build over agreement?

A buyer's solicitor may raise enquiries where building work appears to affect a public sewer and no agreement is available. The appropriate response depends on the sewer status, when the work was carried out and the relevant sewerage company's requirements. Your conveyancer can advise what evidence is needed for the transaction.

Do pre 2011 extensions need a build over agreement?

The October 2011 transfer in England and Wales changed responsibility for many existing private sewers and lateral drains, so the present status of a pipe may differ from its status when older work was carried out. Whether an agreement should have existed depends on the pipe and the rules applying at the time. Check the drainage records and take conveyancing or sewerage-company advice where this matters.

How much does a build over agreement cost?

Water companies set their own application fees, and these vary by company and by the size of the sewer. A survey, drawings and any foundation design are separate. Prices require a real quote, and the drivers include the length of sewer surveyed, access and whether a post construction survey is needed.