If proposed work is over or close to a public sewer or lateral drain, the relevant sewerage company may require a build over agreement and supporting survey information. We can help arrange pre-construction and post-construction CCTV surveys to the specification required for the site.
Why a build over survey may be required
Where building work is proposed over or close to a public sewer or lateral drain, the sewerage company may need to assess how the work affects the pipe and future access. The distance and application type vary by company, pipe and type of development, so the current requirements for the site should be checked before the survey is booked.
A CCTV survey can provide a record of visible pipe condition before work and, where required, after construction. Whether a pre-construction survey, post-construction survey or other evidence is needed depends on the sewerage company’s application process and what has been agreed for the project.
We can help with CCTV surveys of public and private drainage for build over agreement applications, including the pre-works condition record and the post-completion check.

What the survey may need to show
The required survey content depends on the sewerage company and the application. Where specified, the report may need to cover:
- Condition of the sewer along the affected length, with defects coded to a recognised system
- Line and level, so the depth of cover and any change in gradient can be seen
- Manhole and inspection chamber positions, including covers, frames and benching
- Material and approximate diameter of the pipe
- Connections and junctions entering the length
Pipe depth, line and condition can be relevant to foundation design and the sewerage company’s assessment. The required measurements and any additional survey method should be agreed for the particular application rather than assumed from a standard CCTV survey.
Survey specification and coding
Where required, defects can be recorded using MSCC5, the Manual of Sewer Condition Classification. The relevant sewerage company may require a particular coding standard, footage format or condition record for its application.
Report contents depend on the agreed specification. Where the line of the sewer also needs to be established, a drain mapping exercise or other tracing work may be appropriate. If the sewerage company has issued a pro forma or a list of required fields, pass it on before the survey so the report can be specified around it.
A build over CCTV report may include recorded footage, defect observations, pipe locations and a condition log. Some sewerage companies require particular drawings, measurements or forms as part of their assessment. CCTV records internal pipe condition but cannot establish every aspect of a sewer’s structural condition.
Avoiding gaps in a submission
A submission can be delayed or queried if information required by the sewerage company is missing. Depending on the stated requirements, points to check include:
- No depth or level information, so the assessor cannot judge cover over the pipe
- Missing manhole details, or chambers not opened and recorded
- The surveyed length stopping short of the full affected area
- Defects described in plain words rather than coded to the required system
- No plan showing the pipe in relation to the proposed structure
- Footage that is too dark, too fast or unlabelled to be followed
Use the sewerage company’s stated requirements as the survey specification. If an earlier submission has been queried, compare the report with the points raised before arranging further work.

Surveys before and after construction
Where a pre-works survey is required, it provides a condition record before construction that could affect the pipe. The length to be surveyed and any action required if defects are found should follow the sewerage company’s specification for the application.
Where a post-completion survey is required, it can be compared with the earlier record to identify visible changes. Access after construction may be different, so the survey extent and access points should be considered when the work is specified.
The timing of CCTV inspection can matter where a sewer will become inaccessible beneath a new structure. A pre-construction record establishes the visible condition before building work, while a later inspection can identify visible changes where the pipe remains accessible.
Conservatories, extensions and other structures
Do not assume that a conservatory, extension, garage or other structure is exempt. Whether an agreement or survey is required depends on the sewerage company’s current policy, the pipe and the proposed work.
Public sewer records may show a pipe near a proposed extension, but the recorded position is not always exact. A sewer CCTV survey, supported by tracing or mapping where necessary, can help establish its location. Our Build Over Agreement Checker explains the main factors affecting the need for an agreement.
National differences and safety
Build over rules are set by the water company that owns the sewer, and the position differs across the UK. In England, Approved Document H of the Building Regulations covers foul water drainage and pipe protection, and the water company’s own build over policy sits alongside it. Scotland, Wales and Northern Ireland each have their own building standards and sewerage arrangements, so the requirements for a given site must be checked with the relevant authority and sewer owner rather than assumed from an English example.
Entry into manholes or chambers can involve confined-space risks and should be avoided where reasonably practicable. Where the Confined Spaces Regulations 1997 apply, the work requires appropriate risk assessment, precautions and emergency arrangements. CCTV equipment can often be operated without a person entering the chamber.
Cost and scheduling
Price depends on the length of sewer to be surveyed, the depth and diameter of the pipe, how many manholes need opening, whether the survey is inside a live highway, and the level of reporting the water company expects. A short shallow run between two chambers is a different job from a deep trunk sewer under a busy road with traffic management. A real quote is needed for a real site.
The distance between the proposed building and the sewer can affect the sewerage company’s requirements. Pipe depth, diameter and condition may also matter. Where CCTV evidence is required, the report needs to relate clearly to the sewer affected by the proposed construction.
Free online tool
Build Over Agreement Checker
Building over or near public drains and sewers
Common questions
Frequently asked questions
Do I need a build over CCTV survey for a conservatory?
A conservatory may require a build over agreement if it affects a public sewer or lateral drain. The answer depends on the sewer's location, size and depth, the proposed foundations and the sewerage company's requirements. Not every conservatory requires CCTV inspection.
What if the sewer is already damaged before work starts?
The pre-works survey records visible existing condition, including any defects within the surveyed area. If defects are found, provide the report to the sewerage company where required and follow its response. Any repair, further investigation or change to the application depends on the site and the company's requirements.
Who pays for the survey?
The property owner or developer will generally be responsible for the cost of a separately commissioned CCTV survey. Sewerage companies may also charge application fees. The charges depend on the company and the application, and a survey is not necessarily included in the application fee.
Will the water company accept a survey coded to MSCC5?
Many do, but requirements vary and must be confirmed before the survey is booked. Some water companies issue a pro forma or a list of required fields, and some ask for a plan or level data alongside the coded log. Passing on the water company's stated requirements before the survey helps the report match what the assessor expects.
Can the survey be done after the build instead of before?
Follow the sewerage company's required sequence. Where a pre-construction condition record is required, a survey carried out only after the build cannot provide that earlier baseline. Some application types also require a post-completion survey.